Sensilo plant
The factory of the future
At a cost of around 50 million euro, the new building in the Fulda-West Technology Park is the largest investment in JUMO's history. As such, it successfully sets the course for the future. After all, around 10,000 m² of manufacturing area is available for the production of temperature and pressure sensors. The new plant is also leading the way when it comes to innovation, digitization, and sustainability. You benefit from:
Short delivery times
icon-truck
High quality
icon-diamond
Sustainable production
icon-globe

Faster delivery? We make it happen.

Our newly structured production and logistics processes, which are geared towards material flow, have resulted in process sequences that are designed for efficiency and fast delivery capability right from the start – an advantage that you, as a customer, will immediately notice. State-of-the-art machinery and additional production capacity ensure that we can deliver reliably even at high utilization levels, while the newly gained space enables further growth and secures supply as demand increases. Because speed never comes at the expense of quality for uconsistently optimized ESD protection ensures the high standard of our sensors.

Minimal CO2 footprint

SENSILO's innovative energy concept was co-financed by the European Union. It includes a sprinkler tank for energy storage, heat pumps, geothermal probes, refrigeration machines, and a powerful photovoltaic plant. As a result, peak loads can be capped, energy demands can be rescheduled, and waste heat can be used efficiently so that the use of fossil fuels is unnecessary. CO₂ emissions and primary energy consumption are also significantly reduced. Any unmet energy demand is covered by purchasing green electricity.

Numbers – Data – Facts

  • 13,000 m² building area, 10,000 m² manufacturing area, 99,999 m² land area
  • Production hall with 800 m² cleanroom, logistics hall, production-related administration
  • 700 kW of photovoltaic capacity on the roof
  • 20 geothermal probes, each reaching 100 meters deep
  • 1.2 MW/h of cooling capacity for building air conditioning
  • Industrial floor heating system covering more than 8500 m²

Opening ceremony

Employee event and topping-out ceremony

Groundbreaking ceremony